Study of the value and evolution of the durability and deformability parameters for the concrete used in construction falsework, and adjustment of the criteria for erection and removal of falsework in line with different temperature and moisture conditions

This project is funded by the Centre for the Development of Industrial Technology (CDTI) and involves the adjustment of criteria for the erection and removal of construction falsework, in line with the different temperature and moisture conditions that may prevail at different times of the year and the different geographical areas in which BECSA operates, while at the same time improving the models for distributing the loads between the falsework erected.