Applied research into the manufacture of artificial sections (BARA) for the construction of dykes

This project focuses on the study of the main conditions, parameters and procedures that affect the setting time for sections with a defined geometry, with the aim of optimising these parameters and thereby defining the most suitable methodology for reducing the amount of time required for production and entry into service.